Monday/Tuesday/Wednesday – Exams – Days 137-139

December 17, 2012

I had experienced multiple exam periods before, but none so stressful as what I experienced at Penn. Possibly one of the most stressful weeks of my life and, unfortunately I lacked the perspective to step back from it.

The week didn’t begin so badly, with a few major projects due Tuesday but no exam till Thursday. I thought all was well as I’d planned ahead and completed most of the projects. Monday held two PGC gigs, both of which were pretty awesome. The first of those being a performance at the top of the Huntsman building, on the eighth floor, never seen on regular occasions by students. One could tell the event was of higher status than some of the others by the flashy catering provided and the seemingly unlimited supply of pepper steak being carved up for the guests. Our performance however, was less than stellar and I’m not 100% sure we earned our keep that time. However, we had a chance to redeem ourselves later in the evening with the President herself, Amy Guttmann.However before that there was coding to be done in the break and candle lighting at Hillel with a brief appearance by President Guttmann.Amy Guttmann Lights Chanukkah Candles

 

Following her speech there was a performance, as below, by the Jewish acapella group on campus, the Shabbatones.

Following that it was again, a short period of study and work before a trip to the fantastic Presidential Holiday Party at the house of the President herself.

Line to the Party

There was a line out the front reaching a decent way back and understandably so, for on the other side the beautifully adorned building was a back garden filled with desserts and holiday treats. However, the Glee Club was sequestered to a side room to await our performance.

PGC Waiting

We waited anxiously for the entire crew to arrive and when they did, we sang our bit before spending time mingling. It was during this period that I managed to snag a photo with the President, one for the wall.

Holiday Party with Students

After all this hubbub I planed to work a little and then sleep early. Unfortunately, a few small issues with my code ballooned out and ending up taking me till the early hours of the morning, programming in Engineering, Moore 100. Around me students with bleary eyes were all focused on the same goal. Completing the assignment by 10AM Tuesday. Many fell by the wayside or more literally, fell asleep.

Tuesday morning I slept through most of and the evening was spent in a mixture of coding and revising. Today was also the day that the family visited Penn and I spent at least a little time showing them around before my recital at 1PM where I sang fly me to the moon. Email me for a link to that video.

Different project this time and lots of math catchup for the algorithms course.I seem to be doing this more frequently, but another significant event this past week was another interview, this time for an on campus position of ‘Teaching Assistant’ or TA (tutor) for the algorithms course. This applied extra pressure on me to do well on the exam to prove myself. The interview in fact went excellently, and the interviewer Val Tannen, had a few words with me after that were most encouraging. It was then on Tuesday I received notification that not only had I succeeded in being offered a TA job, I was to be given a tutorial/section/lab to teach because of my strong performance. This made me nervous a little but I was more than happy to accept. In the evening I went for a delicious dinner with my parents before arriving back on campus a little after nine PM to get back to work. However at around ten PM I received an SMS from JHo, my Glee mentor, wondering where I was at auditions, and then it hit me, I had forgotten my audition slot half an hour beforehand for the PGC Spring Show! The moment I received that message I grabbed my coat, some sheet music and, sprinted as fast as I possibly could, over to Platt Student Performing Arts Center where I was the last person to have my audition and, though I was a little stressed out I felt it went relatively well.

Wednesday was a non stop day of study, almost without pause and the study went well into the night where I helped out a few friends with their questions. Unfortunately for me, I never remember that when I manage to help others for an exam, I often doom my own performance….

Shabbat/Sunday – Day 135/136

December 13, 2012

Shabbat was another day of sleep mixed in with Glee gigs, including the Winter Holiday Concert featuring such numbers as O Magnum Mysterium, a Christian religion piece, and Maoz Tzur, a traditional Chanukah piece. Unfortunately, whilst it was all recorded, the videos aren’t available to the public and thus I can’t post them here! Motzei Shabbat after the concert I started working for what was bound to be a super stressful week. Exams and my two final projects!

Sunday was spent almost entirely on my Ruby on Rails project which is now almost ready to go live. The basic idea is that people at Penn aren’t always so open to meeting new people and so my website is designed to encourage interaction. It does so through a simple interface by which people sign up for coffee dates with each other using their UPenn email and when to meet.

The evening however was something that I had been looking forward to for a great period of time; the Glee Penn/Dance semi formal. My date was the lovely Stephanie Li of choral society fame and though I had to wait a little past time for her to prepare herself, it was certainly worth the extra few minutes as she and I had such an enjoyable time that evening. First was dinner with the newmen and some of the sophomore’s. It was a BYO which left a certain PGC member unable to behave responsibly and so Steph, I and his date set to helping him out.

 

Steph and I

Steph and I

Following that PGC and PD had booked a bar for the rest of the evening and for once, I felt really comfortable in a social situation, given that I was close friends with the vast majority of people there. Steph I believe had an excellent time too, and when it finished at around 1AM I was somewhat disappointed, despite knowing I needed the sleep before my exams week!

Tuesday/Wednesday – Day 131/132

December 7, 2012

Finals period is fast approaching. Though, for some reason it seems like it’s already here. I have so many tests and assignments due that I feel as if the exams crept up on me and then even passed by without a chance for me to jump on the horse. Tuesday saw the submission of my last Operating Systems homework, along with a final lecture that was a combination of revision and just fun presentations, to mark the end of semester. However now that that was over it was a bug in my algorithms code that was driving me to distraction!

The Glee Club rehearsal in the evening was quite enjoyable with more directors being trialled and more theatre sports and games played. Also, final prep for our concert on Shabbat, that though the music is perhaps not my favorite, I’m still looking forward to.

Wednesday saw me in two almost empty classes. Apparently everyone but me had already realized that midterms placed in the last week are in fact, exams by another name.

At this point in semester, every spare moment was spent working on something or other, jumping between the various things that needed completing.

Tonight after Glee Rehearsal I interviewed one of my favorite baritone personalities, Mr Mychajlo Kosyk, of a definite notoriety. It was a fantastic opportunity to get to know him a bit better and I was sorely disappointed when our time ran low and we both returned to our respective workloads. In my case this meant preparing for both the final physics assignment and, the OS final exam the next day. Needless to say, as much procrastination as work followed and I didn’t get all I wished done.

© 2012-2025 Shaanan Cohney